  • 150 Turnkey rollout 2G sites: RBS2116, 2216, 2206, 2106, Ericsson-Meditel Project

  • 60 Node B installations, Commissioning and Integration: Ericsson-Meditel Project.

  • 100 Site Swap of RBS2206 by new generation RBS2216: Ericsson-Meditel Project.

  • 185 sites Node B Ericsson in 2007, Meditelecom 3G rollout in order to offer broadband service

  • 250 ML TN et HC Ericsson Meditelecom in 2007, 3G Backhaul network

  • 85 Sites Ericsson 2G Radio and Transmission in 2007, Meditelecom Network expansion

  • Installation of 3 RNC and 3 RXI in 2007: Ericsson 2007, Meditel UMTS Core network.

  • 100 Sites Ericsson RBS and Minilink installed and integrated in 6 months: Project Ph 10 Ericsson – Meditel. Major Agreement with Ericsson Maroc for the whole Project (project on hold). 2005-2006.

  • 18 BSR (WiMAX for Ericsson Maroc, Meditelecom wire line network start up.

  • 25 ProST (Professional Subscriber Terminal), installation at End user Customer Office.

  • Survey Site and Installation on hold of Minilink Traffic Node for SENELEC (CBI); Installation of WiMAX Alvarion also: Senegal.2005-2006.

  • Ericsson Saudi Arabia: 3 Engineers working on Minilink Traffic Node and High Capacity and RBS2206, 2106 and 2308 for a timestamp of 1 year from December 2004.

  • Ericsson Saudi Arabia: Power and Alarm system operation and maintenance from December 2004 to February 2006.

  • Linking Alcatel ADSL: Subcontracting with Telcabo Maroc,1 month. Project Maroc Telecom.

  • November 2004 until February 2005: Ericsson project Phase 9 on behalf of Telcabo Maroc: the scope of work included: Transportation, Survey, installation and commissioning Meditelecom sites and the project management also. 35 sites integrated.

  • Extension of Ericsson BTS on the behalf of Meditelecom: from June 2004 to October 2004, approximately 47 sites.

  • SWAP Line FES-BENIMELLAL Radios and Transmission equipments: Meditel Project through Telcabo Maroc-June 2004.

  • Commissioning of Ericsson Minilink 4 Links: Project Linfra Maroc-Meditelecom-June 2004.

  • Installation, checking and commissioning of Mobile Stations: Meditel project via Telcabo Maroc Summer Plan (5 Sites)-July 2004.

  • Integrating of 7 BTS2206: Project Ericsson-Maroc Telecom subcontracted by Sirecom-July 2004.

  • Integrating of 3 BTS2206: Project Ericsson-Maroc Telecom via Elecam - August 2004.

  • Installation and commissioning of repeaters Type Andrew, Allgon and Rtemsa for Meditelecom via Ericsson, Telcabo and Techland.

  • Swap of the line Casa-Safi SDH: Project Meditelecom - Telcabo Maroc (2002).

  • Clean up Microwave Meditelecom Phase 2 and 3 (2001-2002): Project Manager M. Oumarou Moussa Y.

  • Ericsson Project: phase 4, 5, 6, 7&8: Implementation and commissioning of 27 sites and 33 sites.

  • Swap BSC links of Lissasfa: Telcabo Meditel account (14 links and also reconfiguration from 1+1 to 2+0)

  • Microwave Upgrade: Project Meditelecom of 45 links Microwave performed by Telcabo with BTScom employers like Saad Alaoui, Issam Mallaki, Ali Raouf as Team Leader and M. Oumarou Moussa Y. handle the project management.

  • Swap Microwave Lissasfa Switch Meditelecom: Project done by the Transmission team of Telcabo Maroc. Mr Oumarou Moussa Y as project manager (2002).

  • Implementation of 27 Links Microwaves Ericsson for Meditelecom Phase 4&5. Project entirely scheduled and implemented the transmission team of Telcabo Maroc Sarl (2002), BTScom team.

  • Improve RSS (Received signal strength) of 25 microwaves links for Ericsson Tunisia with BTScom current team within Telcabo Maroc Sarl (2001).

  • Installation, checking and commissioning of 11 BTS stations and Microwave for Ericsson Aruba (Central America) with BTScom current team within Telcabo Maroc Sarl (2003).
 